INDEKSI GRAĐEVINSKIH
RADOVA U RUJNU 2012.
CONSTRUCTION WORK
INDICES, SEPTEMBER 2012
|
Prema
izvornim indeksima, građevinski radovi u rujnu 2012. u odnosu na rujan
2011. manji su za 18,4%.
|
|
According
to basic indices, in September 2012, as compared to September 2011, construction
works decreased by 18.4%.
|
|
|
|
|
|
Prema
kalendarski prilagođenim indeksima, građevinski radovi u rujnu 2012. u
odnosu na rujan 2011. manji su za 14,3%.
|
|
According
to working-day adjusted indices, in September 2012, as compared to September
2011, construction works decreased by 14.3%.
|
|
|
|
|
|
Prema desezoniranim
indeksima, građevinski radovi u rujnu 2012. u odnosu na kolovoz 2012. manji
su za 1,6%.
|
|
According to
seasonally adjusted indices, in September 2012, as compared to August 2012,
construction works decreased by 1.6%.
|
1. INDEKSI
FIZIČKOG OBUJMA GRAĐEVINSKIH RADOVA1)
TOTAL
VOLUME INDICES OF CONSTRUCTION WORKS1)
|
|
Ø
2005. = 100
|
IX. 2012.
VIII.
2012.
|
IX. 2012.
IX.
2011.
|
IX. 2012.
Ø
2011.
|
I. – IX. 2012.
I.
– IX. 2011.
|
|
|
2011.
|
2012.
|
|
|
IX.
|
X.
|
XI.
|
XII.
|
I.
|
II.
|
III.
|
IV.
|
V.
|
VI.
|
VII.
|
VIII.
|
IX.
|
I. – IX.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ukupno
Total
|
96,1
|
90,0
|
91,4
|
81,9
|
72,6
|
69,1
|
85,7
|
80,4
|
88,4
|
77,9
|
82,9
|
79,2
|
78,4
|
79,4
|
99,0
|
81,6
|
87,6
|
88,1
|
|
Zgrade
Buildings
|
99,7
|
94,2
|
95,5
|
85,7
|
81,5
|
74,8
|
89,5
|
83,8
|
90,6
|
80,1
|
82,3
|
77,6
|
75,8
|
81,8
|
97,7
|
76,0
|
80,2
|
85,7
|
|
Ostale
građevine
Civil engineering works
|
93,3
|
86,8
|
88,1
|
79,0
|
65,7
|
64,6
|
82,6
|
77,8
|
86,6
|
76,1
|
83,3
|
80,5
|
80,4
|
77,5
|
99,9
|
86,2
|
94,0
|
90,3
|
1) Izvorni
indeksi (kalendarski i sezonski neprilagođeni)
1) Basic indices (working-day and seasonally
non-adjusted)

2. MJESEČNE
STOPE PROMJENA IZRAČUNANE IZ DESEZONIRANIH INDEKSA
MONTH-ON-MONTH
GROWTH RATES CALCULATED ON BASIS OF SEASONALLY ADJUSTED INDICES
%
|
|
IV.
2012.
III. 2012.
|
V.
2012.
IV. 2012.
|
VI.
2012.
V. 2012.
|
VII.
2012.
VI. 2012.
|
VIII.
2012.
VII. 2012.
|
IX.
2012.
VIII. 2012.
|
|
|
|
|
|
|
|
|
|
|
|
Ukupno
|
0,0
|
-0,6
|
-3,6
|
0,9
|
-2,2
|
-1,6
|
Total
|
|
|
|
|
|
|
|
|
|
|
Na zgradama
|
-1,5
|
-0,6
|
-3,5
|
-1,2
|
-2,3
|
-3,3
|
On
buildings
|
|
Na ostalim građevinama
|
-0,2
|
0,4
|
-5,1
|
4,0
|
-2,4
|
0,0
|
On civil
engineering works
|
3. GODIŠNJE
STOPE PROMJENA IZRAČUNANE IZ KALENDARSKI PRILAGOĐENIH INDEKSA
YEAR-ON-YEAR GROWTH RATES CALCULATED ON
BASIS OF WORKING-DAY ADJUSTED INDICES
%
|
|
IV.
2012.
IV. 2011.
|
V.
2012.
V. 2011.
|
VI.
2012.
VI. 2011.
|
VII.
2012.
VII. 2011.
|
VIII.
2012.
VIII. 2011.
|
IX.
2012.
IX. 2011.
|
|
|
|
|
|
|
|
|
|
|
|
Ukupno
|
-7,9
|
-9,0
|
-12,4
|
-9,8
|
-11,8
|
-14,3
|
Total
|
|
|
|
|
|
|
|
|
|
|
Na zgradama
|
-11,5
|
-12,4
|
-15,8
|
-14,0
|
-15,4
|
-20,7
|
On
buildings
|
|
Na ostalim građevinama
|
-5,9
|
-5,3
|
-10,4
|
-5,6
|
-10,4
|
-9,4
|
On civil
engineering works
|
4. VREMENSKE
SERIJE INDEKSA FIZIČKOG OBUJMA GRAĐEVINSKIH RADOVA
TIME
SERIES OF TOTAL VOLUME INDICES OF CONSTRUCTION WORKS
Æ
2005. = 100
|
|
|
Ukupno
Total
|
Na zgradama
On
buildings
|
Na ostalim građevinama
On
civil engineering works
|
|
|
izvorni
indeksi
Basic
indices
|
kalendarski
prilagođeni indeksi
Working-day adjusted indices
|
desezonirani
indeksi
Seasonally
adjusted indices
|
trend-
-indeksi
Trend
indices
|
izvorni
indeksi
Basic
indices
|
kalendarski
prilagođeni indeksi
Working-day adjusted indices
|
desezonirani
indeksi
Seasonally
adjusted indices
|
trend-
-indeksi
Trend
indices
|
izvorni
indeksi
Basic
indices
|
kalendarski
prilagođeni indeksi
Working-day
adjusted indices
|
desezonirani
indeksi
Seasonally
adjusted indices
|
trend-
-indeksi
Trend
indices
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2010.
|
IX.
|
103,9
|
102,6
|
96,6
|
96,9
|
109,5
|
108,2
|
103,8
|
103,6
|
99,6
|
98,4
|
90,9
|
91,1
|
|
|
X.
|
97,2
|
101,4
|
96,1
|
95,7
|
101,2
|
105,8
|
100,8
|
102,1
|
94,1
|
98,1
|
91,5
|
90,1
|
|
|
XI.
|
97,7
|
97,3
|
93,9
|
94,3
|
105,7
|
106,7
|
102,8
|
100,9
|
91,4
|
90,6
|
87,2
|
89,0
|
|
|
XII.
|
89,8
|
87,1
|
93,1
|
93,4
|
94,5
|
92,8
|
97,8
|
99,3
|
86,1
|
83,6
|
88,9
|
88,6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2011.
|
I.
|
77,0
|
79,5
|
93,0
|
92,9
|
85,6
|
89,5
|
98,2
|
98,2
|
70,2
|
72,8
|
89,1
|
88,5
|
|
|
II.
|
83,6
|
83,6
|
92,5
|
92,4
|
92,2
|
93,0
|
98,3
|
97,4
|
76,7
|
76,7
|
87,4
|
88,2
|
|
|
III.
|
97,9
|
94,4
|
92,0
|
91,4
|
102,4
|
99,1
|
95,5
|
96,2
|
94,4
|
92,2
|
89,4
|
87,3
|
|
|
IV.
|
89,3
|
91,7
|
89,2
|
90,3
|
94,7
|
99,0
|
95,0
|
95,5
|
85,0
|
86,2
|
84,1
|
85,6
|
|
|
V.
|
96,0
|
97,1
|
90,2
|
89,8
|
103,4
|
103,7
|
95,8
|
95,5
|
90,2
|
91,5
|
84,1
|
84,3
|
|
|
VI.
|
91,6
|
91,3
|
89,5
|
89,3
|
97,2
|
100,1
|
95,8
|
94,8
|
87,2
|
86,7
|
83,9
|
83,9
|
|
|
VII.
|
90,0
|
92,9
|
88,3
|
88,7
|
93,7
|
96,0
|
92,6
|
93,4
|
87,0
|
89,5
|
83,2
|
84,1
|
|
|
VIII.
|
89,2
|
89,2
|
88,1
|
88,4
|
89,8
|
92,0
|
91,8
|
92,9
|
88,7
|
88,9
|
85,5
|
84,5
|
|
|
IX.
|
96,1
|
94,9
|
89,2
|
88,3
|
99,7
|
98,5
|
94,6
|
93,1
|
93,3
|
91,9
|
84,7
|
84,3
|
|
|
X.
|
90,0
|
91,6
|
87,0
|
87,9
|
94,2
|
96,5
|
92,2
|
92,8
|
86,8
|
88,6
|
82,6
|
84,0
|
|
|
XI.
|
91,4
|
92,0
|
88,3
|
87,7
|
95,5
|
96,4
|
92,4
|
92,2
|
88,1
|
88,8
|
85,2
|
84,0
|
|
|
XII.
|
81,9
|
82,7
|
87,7
|
87,3
|
85,7
|
87,8
|
92,0
|
91,6
|
79,0
|
78,8
|
83,7
|
83,6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2012.
|
I.
|
72,6
|
74,2
|
86,3
|
86,1
|
81,5
|
83,5
|
90,8
|
90,2
|
65,7
|
67,6
|
82,5
|
82,4
|
|
|
II.
|
69,1
|
69,5
|
76,7
|
84,5
|
74,8
|
74,1
|
78,0
|
88,1
|
64,6
|
64,9
|
73,9
|
81,1
|
|
|
III.
|
85,7
|
84,2
|
82,3
|
83,1
|
89,5
|
88,4
|
85,4
|
85,9
|
82,6
|
81,8
|
79,4
|
80,0
|
|
|
IV.
|
80,4
|
84,5
|
82,3
|
82,1
|
83,8
|
87,6
|
84,1
|
84,4
|
77,8
|
81,1
|
79,3
|
79,3
|
|
|
V.
|
88,4
|
88,3
|
81,8
|
81,1
|
90,6
|
90,9
|
83,6
|
82,9
|
86,6
|
86,6
|
79,6
|
78,4
|
|
|
VI.
|
77,9
|
80,0
|
78,9
|
79,9
|
80,1
|
84,3
|
80,7
|
81,2
|
76,1
|
77,6
|
75,5
|
77,5
|
|
|
VII.
|
82,9
|
83,9
|
79,6
|
78,9
|
82,3
|
82,5
|
79,7
|
79,5
|
83,3
|
84,5
|
78,5
|
77,3
|
|
|
VIII.
|
79,2
|
78,7
|
77,8
|
77,9
|
77,6
|
77,8
|
77,9
|
77,7
|
80,5
|
79,6
|
76,7
|
77,0
|
|
|
IX.
|
78,4
|
81,4
|
76,6
|
76,8
|
75,8
|
78,1
|
75,3
|
75,9
|
80,4
|
83,3
|
76,6
|
76,4
|
5. STRUKTURA ODRAĐENIH SATI NA GRADILIŠTIMA
PREMA VRSTAMA GRAĐEVINA I RADOVA
COMPOSITION
OF HOURS WORKED ON SITES, BY TYPES OF CONSTRUCTIONS AND TYPES OF WORKS
%
|
|
IX. 2012.
|
I. – IX. 2012.
|
|
|
|
ukupno
Total
|
novogradnja
New
constructions
|
ostali
radovi1)
Other works1)
|
ukupno
Total
|
novogradnja
New
constructions
|
ostali
radovi1)
Other works1)
|
|
|
|
|
|
|
|
|
|
|
|
Ukupno
|
100,0
|
54,2
|
45,8
|
100,0
|
55,6
|
44,4
|
Total
|
|
Na zgradama
|
42,6
|
28,6
|
14,0
|
45,4
|
30,9
|
14,5
|
On
buildings
|
|
Na ostalim
građevinama
|
57,4
|
25,6
|
31,8
|
54,6
|
24,7
|
29,9
|
On civil
engineering works
|
1) Rekonstrukcije
(poboljšanja postojećih građevina), popravci i održavanje
1) Reconstructions, repair works and
maintenance of existing constructions

|
METODOLOŠKA OBJAŠNJENJA
|
|
NOTES ON METHODOLOGY
|
|
|
|
|
|
Izvor i
metode prikupljanja podataka
|
|
Sources
and methods of data collection
|
|
|
|
|
|
U ovom
priopćenju iskazani su podaci prikupljeni izvještajnom metodom s pomoću
obrazaca Mjesečni izvještaj građevinarstva (GRAĐ-21/M) i Tromjesečni
izvještaj građevinarstva (GRAĐ-21/3M).
|
|
Data on
construction presented in this publication are collected through reporting
method by using the Monthly Report on Construction (GRAĐ-21/M form) and the
Quarterly Report on Construction (GRAĐ-21/3M form).
|
|
|
|
|
|
Obuhvat
i usporedivost
|
|
Coverage
and comparability
|
|
|
|
|
|
Mjesečni i Tromjesečni izvještaj građevinarstva
prikupljaju se za pravne osobe ili njihove dijelove s 20 i više zaposlenih
koji su u Registru poslovnih subjekata prema NKD-u 2007. (NN,
br. 58/07.) razvrstani u područje F
Građevinarstvo. Prosječno se godišnje obuhvaća oko 900 izvještajnih
jedinica.
|
|
The
Monthly and the Quarterly Report on Construction are collected from legal
entities and parts thereof employing 20 or more persons classified in the
Register of Business Entities to section F Construction according to the
NKD 2007. (NN, No. 58/07). About 900 reporting units are included in the average annual
dynamics.
|
|
|
|
|
|
Podaci
se odnose na građevinske radove (na novim građevinama, rekonstrukcijama,
popravcima i održavanju postojećih građevina) izvršene na području
Republike Hrvatske. Razvrstavanje građevina i radova izvršeno je prema
Klasifikaciji vrsta građevina, koja je usklađena s klasifikacijom koju
propisuje Eurostat (Classification of Types of Constructions – CC, final
version).
|
|
Data
refer to all construction works (new constructions and reconstructions,
maintenance and repair works on existing constructions) done on the
territory of the Republic of Croatia. Constructions and works are classified
according to the Classification of Types of Constructions – KVG, which is
harmonised with the classification prescribed by the Eurostat (the
Classification of Types of Constructions − CC, final version).
|
|
|
|
|
|
Metoda
izračunavanja indeksa
|
|
Index method
|
|
|
|
|
|
Indeks fizičkog obujma
građevinskih radova temelji se na odrađenim satima radnika na gradilištima
prema Metodologiji za kratkoročne poslovne statistike, tumačenje i
smjernice na temu Industrija, trgovina i usluge, ISSN 1725-0099, Europske
zajednice, 2006.
|
|
The total volume index of construction works
is based on the number of hours worked on sites, according to the
Methodology of short-Term
Business Statistics, Interpretation and Guidelines, Theme: Industry, Trade
and Services, ISSN 1725-0099, European Communities, 2006.
|
|
|
|
|
Indeksi
fizičkog obujma građevinskih radova u ovom se priopćenju prikazuju kao
izvorni (neprilagođeni) indeksi, desezonirani indeksi (iz kojih je
isključen utjecaj kalendarskih dana i sezonske komponente), kalendarski
prilagođeni indeksi (iz kojih je isključen utjecaj kalendarskih dana, npr.
broj radnih dana, nacionalni blagdani, učinak Uskrsa itd.) te trend-indeksi
(desezonirani indeksi iz kojih je isključen utjecaj slučajne komponente).
|
|
Total
volume indices of construction works are presented in this release as basic
(non-adjusted) indices, seasonally adjusted indices (in which the effect
of certain calendar days and the seasonal effect have been excluded), the
working-day adjusted indices (in which the effect of certain calendar days
has been excluded, e.g., the number of working days, national holidays,
Easter etc.) and the trend indices (seasonally adjusted indices from which
the random component effect has been excluded).
|
|
|
|
|
|
Desezoniranje
i kalendarska prilagodba provedeni su s pomoću programskog sučelja
„Demetra“ – Eurostat, verzija 2.2. iz 2008., upotrebom metode TRAMO-SEATS
na mjesečnoj seriji indeksa (Ø 2005. = 100), koja počinje
indeksom za siječanj 1998. Izračunane serije indeksa fizičkog obujma
građevinskih radova usporedive su s onima koje objavljuje Eurostat.
|
|
The
seasonal and working-day adjustment were done by applying the
"Demetra" programme interface – Eurostat, version 2.2 of 2008, by
using the TRAMO/SEATS Method on the monthly index series (Ø 2005 = 100),
which begins with the index for January 1998. Calculated series of volume
indices of construction works are comparable to those published by the
Eurostat.
|
|
|
|
|
|
Produžavanje
serije indeksa dodavanjem novih mjesečnih podataka može zbog značajki
primijenjene metode desezoniranja prouzročiti naknadne promjene
desezoniranih indeksa te trend-indeksa za protekla razdoblja.
|
|
The
prolongation of the index series by adding new monthly data may cause
subsequent changes in seasonally adjusted series and trend indices for
several previous months, due to characteristics of the applied method of
seasonal adjustment.
|
|
|
|
|
|
Opširnija
metodološka objašnjenja za ova istraživanja objavljena su na internetskim
stranicama Državnog zavoda za statistiku (www.dzs.hr).
|
|
More
detailed notes on methodology of these surveys are published on the web
site of the Croatian Bureau of Statistics (www.dzs.hr).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Kratice
|
|
Abbreviations
|
|
|
|
|
|
Eurostat
itd.
NKD
2007.
NN
npr.
|
Statistički
ured Europske unije
i tako
dalje
Nacionalna
klasifikacija djelatnosti, verzija 2007.
Narodne
novine
na
primjer
|
|
e.g.
etc.
Eurostat
NKD
2007.
NN
|
for example (from Latin: exempli gratia)
and so on (from Latin: et cetera)
Statistical Office of the European Communities
National
Classification of Activities, 2007 version
Narodne
novine, official gazette of the Republic of Croatia
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Izdaje i
tiska Državni zavod za statistiku Republike Hrvatske, Zagreb, Ilica 3, p. p.
80.
Published and printed by the Croatian Bureau of Statistics, Zagreb, Ilica 3, P. O. B. 80
Telefon/ Phone:
+385 (0) 1 4806-111, telefaks/ Fax: +385 (0) 1 4817-666
Odgovara
ravnatelj dr. sc. Ivan Kovač.
Person responsible: Dr. Ivan Kovač, Ph.D.,
Director General
Priredile:
Blanka Pađen i Mirjana Mikulić
Prepared
by: Blanka Pađen and Mirjana Mikulić
|
|
MOLIMO KORISNIKE DA PRI KORIŠTENJU PODATAKA NAVEDU
IZVOR.
USERS
ARE KINDLY REQUESTED TO STATE THE SOURCE
|
|
Naklada:
35 primjeraka
35 copies
printed
Obavijesti
daje Odjel informacija.
Information
is available at the Information Department.
Telefon/ Phone:
+385 (0) 1 4806-138, 4806-154, 4811-212
Pretplata
publikacija/ Subscription: +385 (0) 1 4814-791
Telefaks/ Fax:
+385 (0) 1 4806-148, 4806-199
Elektronička
pošta/
E-mail: stat.info@dzs.hr
Internetske
stranice/
Web site: http://www.dzs.hr
Podaci iz
ovog priopćenja objavljuju se i na internetu.
First
Release data are also published on the Internet.
|